Subfloor preparation
Existing coverings were removed, exposed areas reviewed and local preparation completed before final installation.
A public-use flooring replacement case study. Final contracting-route wording should be checked before presenting it as a direct Veraxus Ltd contract.
Walton Hall required the replacement of tired end-of-life floor coverings in public-use rooms, with the works needing to be controlled, tidy and suitable for handback to a professional client environment.

Existing coverings were removed, exposed areas reviewed and local preparation completed before final installation.
LVT pattern installation, carpet replacement, edge finishing and dressing created a clean public-use presentation.
RAMS, waste control and final inspection/handover discipline were recorded in the source case study.
Useful public-sector proof point for controlled works, professional finish and clean handover.






Veraxus can provide appropriate evidence, policies and supporting documents where disclosure is permitted and proportionate.